The Orinoco River Crossing and Rio Meta project in Venezueala was conducted for the client Cadefe – ISA in 2004.
Venezuela - Orinoco River Crossing

FACTS
-
Vano Meta: 1.490 m
-
Vano Orinoco: 1.090 m
-
Suspension construction: 75 m
-
Tention EDS: 40% UTS
-
Conductor phase: Alumoweld 19N9
-
Vibration measurments: 24 months



