Venezuela - Orinoco River Crossing

The Orinoco River Crossing and Rio Meta project in Venezueala was conducted for the client Cadefe – ISA in 2004.

FACTS

 

  • Vano Meta: 1.490 m

  • Vano Orinoco: 1.090 m

  • Suspension construction: 75 m

  • Tention EDS: 40% UTS

  • Conductor phase: Alumoweld 19N9

  • Vibration measurments: 24 months